Wooden parquet is a floor covering material in the form of a prism with a smooth surface, homogeneous thickness, and a lamp and tenon cut in such a way that the sides and head can be combined with each other.
These parquets are grouped as first, second and third class according to their appearance.
During the laying phase, the application must be done carefully. These application stages are the stages from the preparation of the floor to the finish of the flooring and polishing process. An incorrectly prepared floor affects the performance of the parquet quite badly. Due to the wrong application, undesirable conditions such as swelling and opening occur.
Application Methods
It is applied by sticking methods on wooden parquet, blind flooring, nailing or screed. Before the application process is carried out, the ground must be well prepared.
Recommended article, raised floor systems materials click here to get detailed information about it.
Preparation Stages:
The screed must be smooth, hard, clean and dry.
In order to measure the hardness of the screed, it should be checked whether a deep line can be created with the help of a metal rod.
Depending on the season, the screed should be kept between 21 and 45 days.
Screed thickness should be between 2.5-3 cm.
The place where the parquet application will be made must be cleaned of plaster, plaster and any other dirt.
The adhesive to be tiled must not be water-based.
If the application will be made on the old parquet, the varnish of the parquets that will remain underneath should be scraped beforehand.
If the application is to be made in a humid place, the parquet should be brought to the place to be laid 10-15 days beforehand and the boxes should be opened in order to adapt to the humidity in the environment.
In order for the joints in the covering parts of the parquets not to open, the moisture percentage should be between 8-14%. However, in very dry environments, the lower limit must be observed.
After Application
The parquets whose application process is completed are sanded with a scraper motor. After scraping, a coat of primer and polish is applied. Polish paste is applied on the dried polish. In wooden parquets, the color difference that will appear with the scraper and polish after the flooring process is finished should be taken into consideration.